ADDENDUM No: 2, Procurement of Design, Supply and Installation of Grain Steel Silo for Kabul Province

content_admin
Procurement of Design, Supply and Installation of Grain Steel Silo for Kabul Province

Publish Date

Closing Date

Location kabul

ADDENDUM No: 2, IFB No - SGRP-CS-2019-0010

Procurement of Design, Supply and Installation of Grain Steel Silo for Kabul Province

Strategic Grain Reserve Project (SGRP)

Loan No. /Credit No. /Grant No.:P160606

 Addendum No-2 for this procurement is available in these websites. https://www.mail.gov.afhttps://www.npa.gov.af , https://www.undb.org and https://www.acbar.org,   for receiving soft copy of the addendum please contact to Mr. Ziauddin Zia Sr. Procurement Specialist for SGRP/MAIL or Mohammadullah Sahil procurement director of MAIL through the below email address during office hours - 09:00 AM to 15:00 PM hours: ziauddin.zia@mail.gov.af  and mohammadullah.sahil@mail.gov.af.

Propose of the Addendum: As Design, Supply, and Installation of Kabul Silo’s pre-bid meeting took place on August 7th, 2019, where bidders and SGR discussed standard procurement documents, question and answer session held.

Later on, SGR forwarded bidders comments to the World Bank for their review and issuance of NoL and below are the modified parts of the bidding documents for further process after receiving World Bank NoL.

Original Bid

Modified  Bid

(a)  Participation as contractor or management contractor, or subcontractor, in at least one (1) contract within the last five (5) years, each with a value of at least: 4,7 Million US Dollar, that have been successfully and substantially completed (the bidder must provide a certificate for at least two years of satisfactory operation for one project) and that are similar to the proposed Steel Grain Silo Storages and Installation Services. The similarity shall be based on the physical size, complexity, methods/technology or other characteristics as described in Section VI, Employer’s Requirements.

In case a bidder presents its similar experience, which have been performed as subcontractor, the percentage value of the subcontracting must meet the minimum requirement 

(a) Prime contract at least one (1) contract within the last five (5) years, each with a value of at least: 4,7 Million US Dollar, that have been successfully and substantially completed (the bidder must provide a certificate for at least two years of satisfactory operation for one project) and that are similar to the proposed Steel Grain Silo Storages and Installation Services. The similarity shall be based on the physical size, complexity, methods/technology or other characteristics as described in Section VI, Employer’s Requirements.

In case a bidder presents its similar experience, which have been performed as subcontractor, the percentage value of the subcontracting must meet the minimum requirement 

All bidders participated in the pre-bid meeting raised the concern that in terms of specific experience they have completed several silo projects with a capacity of 50,000 MT or higher, but the value is less than the required threshold set in Kabul Silo bidding documents (US$ 4.7 million). Thus, it is unlikely that potential bidders do not have a single similar contract during the last five years with a value of $4.7 million or higher

SGR agreed that the sum of two (2) similar prime contracts can be used to meet only the contract value requirement (US$ 4.7 million) in the specific experience.  In terms of silo storage capacity, the requirement has not changed. Bidders must have a similar single contract for a 50,000 MT steel silo project to be qualified for this bid.

PCC 13.2 Advance Payment: Not Applicable

PCC 13.2 Advance Payment: 10% of total contract value will be paid up on contract signature after receiving advance payment guarantee from a reputed bank.

Part 1, 3 Bid Document, Section III – Evaluation and Qualification Criteria, Page 57,Chart 4 Experience, 4.1 General Experience: Stated,

Design and Construction Experience of Flat Bottom Grain Steel Silo storage with capacity 50, 000MT which each steel silo bin contains at least 5,000 MT capacity with double sheets wall for insulation purpose for storing of wheat at least one year.

Design, Supply and Installation and Experience of Flat Bottom Grain Steel Silo storage with capacity 50,000 MT with single or double sheets wall for insulation purpose for storing of wheat at least one year.

Part 1, 3 Bid Document, Section III – Evaluation and Qualification Criteria, Page 58, Chart 4 Experience, 4.1 General Experience, Electro Mechanical Works:  b) Supply, installation and commissioning of grain conveying and elevating equipment of minimum capacity 200 MTPH each.

b) Supply, installation and commissioning of grain conveying and elevating equipment of minimum capacity 150 MTPH each.

Part 2 Bid Document, Section 01010 Page 9, A. PLAT BOTTOM GRAIN STEEL SILO STORAGE PLANT:

 Conveyor type and  auto truck unloader for 4 trucks which unloaded at the same time, two of them are manually unloaded and two of them are supplied with automatic unloaded truck system

Loading system or the receiving hoppers silo plant (Intake) is 6 noes intakes’, truck accesses to both side of the Intake with automatic bagging system and dumper truck unloading system, the total capacity is 300 MT/H with 2 conveyors @ 150 MT/H each, all hoppers shall be connected two conveyors automatically

Part 2 Bid Document, Section 01010 Page 9, A. PLAT BOTTOM GRAIN STEEL SILO STORAGE PLANT: The unloading (take off) system of silo

Take off or unloading system of silo plant is 4 noes unloading system, the total capacity is 140 MT/H with 3 automatic unloading bagging @ 30 MT/H and one 50 MT/H truck hoppers tack off.

Part 2 Bid Document, Section 01010 Page 10, C. OFFICE BUILDING:

Office building finishing materials.

Office building finishing: Office floor building is furnished by marble. Toilets wall and floors are tile and ceramics. Laboratory floor is granite tile and the walls are tile.

Interior office walls are brick masonry, plaster and paint with RCC roof covered by steel truss and iron sheets.

Office buildings exterior walls and roof are insulated for thermal purpose.

Part 2 Bid Document, Section 01010 Page 10, C. OFFICE BUILDING:

Office building doors and windows.

Office Building Toilet doors are PVC. Interior doors are hollow metal with hollow metal frames.

The exterior doors are heavy duty metal

Part 2 Bid Document, Section 01010 Page 9, B. SITE PLAN:

s)  Parking area for 10 long vehicles at least 40 ft. trucks + trailer, tandem and covered parking area for 10 small cars.

s) Parking area for 15 long vehicles at least 40 ft. trucks + trailer, tandem and covered parking area for 15 small cars.

Part 2 Bid Document, Section 01010 Page 9, B. SITE PLAN:

Site Plan roads and path ways.

Surface or wearing course of the parking and roads are coast in place RCC and related lighting system is per IESNA handbook and NEC standard.

Part 1.3 Page 47 of the document – Section III – Evaluation and Qualification Criteria, 1 Evaluation 1.1 Technical Evaluation

The following point is added on existing paragraph of Bid document:

List proposed technical equipment and machineries of silo Plant and the proposed specification (Used material, specification, made in label and model including cost for each one).

Part 1, 3 Bid Document, Page 64 – Section III – Evaluation and Qualification Criteria. Paragraph 2.5 Personnel:

The Bidder must demonstrate that it will have the personnel for the key positions that meet the following requirements:

Key International staff and qualification for design and construction of the Kabul Grain Steel Silo project:

Position

No.

Minimum Qualifications

Team Leader for design

1

Must have a Master Degree holder in Civil engineering with minimum experience of 15 years in Grain Steel Silos and related structures field design and technical design team management. Must be fluent in English language

Structure designer

1

Must have a Master Degree in Civil engineering with minimum experience of 10 years in design of Grain steel silos and related structures and implementation of steel silo. Must be fluent in English language

Road Designer

1

Must have a Master Degree in Road and related structures with minimum experience of 10 years in road and related structures design. Must be fluent in English language

Mechanical Engineer

1

Must have a Master Degree in HVAC system with minimum experience of 10 years in Grain Steel Silos mechanical system in related system design. Must be fluent in English language

Electro Mechanical Engineer for design and implementation  

1

Must have a Master Degree in Electro Mechanical system with minimum experience of 10 years in Grain Steel Silos Electro Mechanical machinery and in related system design and implementation of the project. Must be fluent in English language

Electrical Engineer for design and implementation  

1

Must have a Master Degree in Electrical engineering with minimum experience of 10 years in Grain Steel Silos and building electrical systems design and implementation of the project. Must be fluent in English language

Water supply/sewer system designer engineer

1

Must have a Bachelor Degree in Water supply & sanitation with minimum experience of 10 years in design of Grain Steel Silos and building water supply/sewer system design. Must be fluent in English language

Quality Control Manager for implementation 

1

Responsibility of quality control managers is to ensure products meet quality and efficiency standards set by the in design document and specification. They are typically required to possess a bachelor's degree in civil Engineering and experience in manufacturing or production of Grain Steel silo. Must be fluent in English language

Construction Team Leader for implementation

1

The role of a team leader is to be able to inspire and encourage their team towards construction of Steel Grain Silo. Their job is to ensure that the standards of the team are always high and the tasks that have been assigned are to be done on time.

2.5 Peronnel

The Bidder must demonstrate that it will have the personnel for the key positions that meet the following requirements:

Key International staff and qualification for design and construction of the Kabul Grain Steel Silo project:

Position

No.

Minimum Qualifications

Team Leader for design

1

Must have a Master Degree holder in Civil engineering with minimum experience of 15 years in Grain Steel Silos and related structures field design and technical design team management. Must be fluent in English language

Structure designer

1

Must have a Bachelor Degree in Civil engineering with minimum experience of 10 years in design of Grain steel silos and related structures and implementation of steel silo. Must be fluent in English language

Road Designer

1

Must have a Bachelor Degree in Road and related structures with minimum experience of 10 years in road and related structures design. Must be fluent in English language

Mechanical Engineer

1

Must have a Bachelor r Degree in HVAC system with minimum experience of 10 years in Grain Steel Silos mechanical system in related system design. Must be fluent in English language

Electro Mechanical Engineer for design

1

Must have a Bachelor Degree in Electro Mechanical system with minimum experience of 10 years in Grain Steel Silos Electro Mechanical machinery and in related system design of the project. Must be fluent in English language

Electrical Engineer for design

1

Must have a Bachelor Degree in Electrical engineering with minimum experience of 10 years in Grain Steel Silos and building electrical systems design of the project. Must be fluent in English language

Water supply/sewer system designer engineer

1

Must have a Bachelor Degree in Water supply & sanitation with minimum experience of 10 years in design of Grain Steel Silos and building water supply/sewer system design. Must be fluent in English language

Geotechnical Engineer

1

Must have a Bachelor Degree in Geotechnical Engineering with minimum experience of 10 years in design geotechnical Engineering project design. Must be fluent in English language

Material Engineer

1

Must have a Bachelor Degree in material engineering with minimum experience of 10 years in civil engineering material testing Engineering project. Must be fluent in English language

Key International Staff During Implementation

Quality Control Manager for implementation 

1

Responsibility of quality control managers is to ensure products meet quality and efficiency standards set by the in design document and specification. They are typically required to possess a bachelor's degree in civil Engineering and experience in manufacturing or production of Grain Steel silo. Must be fluent in English language

Construction Team Leader for implementation

1

The role of a team leader is to be able to inspire and encourage their team towards construction of Steel Grain Silo. Their job is to ensure that the standards of the team are always high and the tasks that have been assigned are to be done on time.

They are typically required to possess a bachelor's degree in civil Engineering and experience in manufacturing or production of Grain Steel silo. Must be fluent in English language

Electro Mechanical Engineer for implementation  

1

Must have a Bachelor Degree in Electro Mechanical system with minimum experience of 10 years in Grain Steel Silos Electro Mechanical machinery and in related system implementation of the project. Must be fluent in English language

Electrical Engineer for implementation  

1

Must have a Bachelor Degree in Electrical engineering with minimum experience of 10 years in Grain Steel Silos and building electrical systems implementation of the project. Must be fluent in English language

Geotechnical Engineer

1

Must have a Bachelor Degree in Geotechnical Engineering with minimum experience of 10 years in geotechnical Engineering construction project. Must be fluent in English language

Material Engineer

1

Must have a Bachelor Degree in material engineering with minimum experience of 10 years in civil engineering material testing Engineering project. Must be fluent in English language

Structure designer

1

Must have a Bachelor Degree in Civil engineering with minimum experience of 10 years in construction of Grain steel silos and related structures and implementation of steel silo. Must be fluent in English language

Road Designer

1

Must have a Bachelor Degree in Road and related structures with minimum experience of 10 years in road and related structures design. Must be fluent in English language

Part 2 Bid Document, Section 01010 Page 9, A)  FLAT BOTTOM GRAIN STEEL SILO STORAGE PLANT:

The following point is added on existing paragraph of Bid document:

1. Grain Bypassing system.

2. Grain Recycling system in bins.

Part 1, 3 Bid Document, Page 64 – Section III – Evaluation and Qualification Criteria.

Paragraph 2.7 Subcontractors:

Note: Sub-contractor must meet the following requirements of sub contracted parts of the contract:

  • Similar contract in construction of Grain Steel Silo: 60%
  • Annual turnover: 110%
  • Available balance: 30%

It has been decided after discussion that Sub-contractor must meet the following requirements of sub contracted parts of the contract:

  • Similar contract in construction of (Civil Work): 90%
  • Annual turnover: 110%
  • Available balance: 30%
  • At least one similar contract in construction of site plan civil work, utilities and facilities of site plan in the last 5 years.

art 1, 3 Bid Document, Section III – Evaluation and Qualification Criteria, Page 57, Chart 4 Experience, 4.1 General Experience:

Civil works:

Site Plan and Building civil Work Design and Construction, Construction of Flat bottom Grain Steel Silo RCC foundation Quantity min 50,000 MT 

Must meet requirement

N / A

N / A

Must meet requirement

Civil works:

Design of Grain Steel Silo Site Plan Civil Work and Design of Flat bottom Grain Steel Silo RCC foundation, Total quantity min 50,000 MT 

Must meet requirement

N/A

N/A

Must meet requirement

Original Bid Opening Date and Time 

Modified  Bid Opening Date and Time 

Date: September 05, 2019

Time: 10:00 AM, Kabul Local Time

Date: September 11, 2019

Time: 10:00 AM, Kabul Local Time

Mr. Mohammadullah “Sahil” Procurement Director

Procurement Directorate of MAIL                                              

Ministry of Agriculture, Irrigation and Livestock 

Jamal Mina, Kabul University Main Road

Kabul - Afghanistan
Telephone: + 93 (0) 202922450

Email: procurement.goods@mail.gov.af